An ultra-high-strength, high-modulus cementitious grout for offshore wind monopile, transition-piece and jacket foundation connections. The reviewed project-specific test set separates every minimum requirement from the corresponding measured result.

Selection focus: offshore wind turbine grout
Sino-sina CBGM-125 offshore wind turbine grout 25 kilogram bag
Unified English packaging - CBGM-125 offshore wind turbine grout

Recommended uses

Where this material fits.

  • Monopile and transition-piece grouted connections
  • Jacket leg and pile annulus grouting
  • Offshore foundation load-transfer zones
  • Marine joints requiring high modulus and stable flow

Performance benefits

What the system is designed to deliver.

  • 131.0 MPa reported 28-day compressive strength
  • 344 mm initial and 312 mm 60-minute flow
  • 47 GPa reported 28-day modulus
  • Verified flexural and splitting tensile strength

Technical data

Requirements and reported values, separated.

“Requirement” is the stated acceptance threshold or range. “Actual result”, “typical value” and “published value” are not guaranteed minima unless the requirement column says so. Final acceptance must follow the approved TDS, report, test method and project conditions.

PropertyMinimum / specified requirementTypical / reported valueTest method / source
Initial setting time≥120 minActual result354 minIndependent commissioned test
Apparent density2,350-2,500 kg/m³Actual result2,400 kg/m³Independent commissioned test
Air content≤4%Actual result1.6%Independent commissioned test
Flowability - initial / 30 / 60 min≥290 / ≥260 / ≥230 mmActual result344 / 320 / 312 mmIndependent commissioned test
3-hour vertical expansion0.1-3.5%Actual result0.12%Independent commissioned test
24-hour minus 3-hour expansion0.02-0.50%Actual result0.11%Independent commissioned test
Compressive strength - 1 / 3 / 28 days≥50 / ≥90 / ≥125 MPaActual result54.0 / 97.3 / 131.0 MPaIndependent commissioned test
Static compressive elastic modulus - 1 / 28 days≥12 / ≥45 GPaActual result13 / 47 GPaIndependent commissioned test
28-day flexural strength≥15.0 MPaActual result16.4 MPaIndependent commissioned test
28-day splitting tensile strength≥6.0 MPaActual result7.1 MPaIndependent commissioned test

Project approval input

Send the data that can change the product decision.

A technical recommendation is only as reliable as the project information supplied with the enquiry.

  1. 01Structure & connection

    Foundation, annulus, segment joint, duct or blade bond-line drawing.

  2. 02Geometry & volume

    Gap, section, lift height, net material volume and contingency.

  3. 03Acceptance criteria

    Strength ages, flow, modulus, bond, fatigue, durability and test methods.

  4. 04Environment

    Material, water, substrate and ambient temperature plus exposure conditions.

  5. 05Installation equipment

    Mixer output, pump, hose diameter, distance, access and standby capacity.

  6. 06Construction window

    Batch cycle, working time, continuous-placement plan, curing and release point.

Independent test evidence

Privacy-protected evidence, not a marketing claim.

Values in the reported-result column were transcribed from independent laboratory reports supplied by Sino-sina. Public material retains Sino-sina Building Materials Co., Ltd. and, where positively verified, the testing institution and report reference; project/client identities, personnel, signatures, stamps, QR codes and contact addresses are omitted.

Download English test summary

Related materials

Compare products in the same engineering family.

Offshore wind turbine grout

HGM-125 Offshore Wind Grout

A polymer- and nano-modified cementitious grout for offshore wind pile-transition zones, jacket pile connections and high-modulus annular load-transfer joints. The supplied manual defines flow retention, early strength, stiffness and zero-bleeding requirements for project screening.
Primary search intent
offshore wind foundation grout
Best fit
Offshore monopile and transition-piece annuli
View product & technical data

Offshore wind turbine grout

CBGM-130 Offshore Grout

A 130 MPa-class offshore wind grout engineered for pumpability, high stiffness, early strength and stable volume in monopile, transition-piece and jacket foundation connections.
Primary search intent
130 MPa offshore wind grout
Best fit
Offshore monopile/transition-piece annuli
View product & technical data

Offshore wind turbine grout

CBGM-C50 Offshore Grout

A high-flow C50-class offshore cementitious grout for bolted monopile skirt annuli, marine infill zones and foundation cavities where stable volume, seawater exclusion and reliable load distribution are required.
Primary search intent
offshore foundation infill grout
Best fit
Bolted monopile skirt annulus infill
View product & technical data

Technical enquiry

Check whether CBGM-125 Offshore Grout matches your project.

Include the wind structure and connection drawing, geometry or bond line, volume, specified performance, temperature, standards, installation window and equipment.