Wind energy materials · onshore · offshore · hybrid towers
info@sino-sina.comWhatsApp +86 153 7387 2353

Offshore wind turbine grout

CBGM-C50 Offshore Foundation Infill Grout

A high-flow C50-class offshore cementitious grout for bolted monopile skirt annuli, marine infill zones and foundation cavities where stable volume, seawater exclusion and reliable load distribution are required.

Selection focus: offshore foundation infill grout
Sino-sina CBGM-C50 offshore foundation infill grout 25 kilogram bag
Unified English packaging - CBGM-C50 offshore foundation infill grout

Recommended uses

Where this material fits.

  • Bolted monopile skirt annulus infill
  • Offshore foundation void filling
  • Marine load-distribution zones
  • Jacket and substation auxiliary grouting

Performance benefits

What the system is designed to deliver.

  • 71.6 MPa reported 28-day compressive strength
  • 315 mm reported initial flow
  • 43.2 GPa reported 28-day modulus
  • Zero bleeding and controlled expansion

Technical data

Requirements and reported values, separated.

“Requirement” is the stated acceptance threshold or range. “Actual result”, “typical value” and “published value” are not guaranteed minima unless the requirement column says so. Final acceptance must follow the approved TDS, report, test method and project conditions.

PropertyMinimum / specified requirementTypical / reported valueTest method / source
Apparent density≥2,100 kg/m³Actual result2,210 kg/m³Independent commissioned test
Air content≤4%Actual result1.7%Independent commissioned test
Initial setting time≥120 minActual result288 minIndependent commissioned test
Flowability - initial / 30 / 60 min≥290 / ≥260 / ≥210 mmActual result315 / 287 / 226 mmIndependent commissioned test
Compressive strength - 1 / 3 / 28 days≥15 / ≥30 / ≥50 MPaActual result20.2 / 46.5 / 71.6 MPaIndependent commissioned test
Static compressive elastic modulus - 1 / 28 days≥10 / ≥40 GPaActual result11.6 / 43.2 GPaIndependent commissioned test
28-day flexural strength≥10 MPaActual result12.8 MPaIndependent commissioned test
28-day splitting tensile strength≥3 MPaActual result4.9 MPaIndependent commissioned test
Bleeding0%Actual result0%Independent commissioned test

Project approval input

Send the data that can change the product decision.

A technical recommendation is only as reliable as the project information supplied with the enquiry.

  1. 01Structure & connection

    Foundation, annulus, segment joint, duct or blade bond-line drawing.

  2. 02Geometry & volume

    Gap, section, lift height, net material volume and contingency.

  3. 03Acceptance criteria

    Strength ages, flow, modulus, bond, fatigue, durability and test methods.

  4. 04Environment

    Material, water, substrate and ambient temperature plus exposure conditions.

  5. 05Installation equipment

    Mixer output, pump, hose diameter, distance, access and standby capacity.

  6. 06Construction window

    Batch cycle, working time, continuous-placement plan, curing and release point.

Independent test evidence

Privacy-protected evidence, not a marketing claim.

Values in the reported-result column were transcribed from independent laboratory reports supplied by Sino-sina. Public material retains Sino-sina Building Materials Co., Ltd. and, where positively verified, the testing institution and report reference; project/client identities, personnel, signatures, stamps, QR codes and contact addresses are omitted.

Download English test summary

Related materials

Compare products in the same engineering family.

Offshore wind turbine grout

HGM-125 Offshore Wind Grout

A polymer- and nano-modified cementitious grout for offshore wind pile-transition zones, jacket pile connections and high-modulus annular load-transfer joints. The supplied manual defines flow retention, early strength, stiffness and zero-bleeding requirements for project screening.
Primary search intent
offshore wind foundation grout
Best fit
Offshore monopile and transition-piece annuli
View product & technical data

Offshore wind turbine grout

CBGM-125 Offshore Grout

An ultra-high-strength, high-modulus cementitious grout for offshore wind monopile, transition-piece and jacket foundation connections. The reviewed project-specific test set separates every minimum requirement from the corresponding measured result.
Primary search intent
offshore wind turbine grout
Best fit
Monopile and transition-piece grouted connections
View product & technical data

Offshore wind turbine grout

CBGM-130 Offshore Grout

A 130 MPa-class offshore wind grout engineered for pumpability, high stiffness, early strength and stable volume in monopile, transition-piece and jacket foundation connections.
Primary search intent
130 MPa offshore wind grout
Best fit
Offshore monopile/transition-piece annuli
View product & technical data

Technical enquiry

Check whether CBGM-C50 Offshore Grout matches your project.

Include the wind structure and connection drawing, geometry or bond line, volume, specified performance, temperature, standards, installation window and equipment.