Offshore wind turbine grout
CBGM-125 Offshore Grout
- Primary search intent
- offshore wind turbine grout
- Best fit
- Monopile and transition-piece grouted connections
Offshore wind turbine grout
A polymer- and nano-modified cementitious grout for offshore wind pile-transition zones, jacket pile connections and high-modulus annular load-transfer joints. The supplied manual defines flow retention, early strength, stiffness and zero-bleeding requirements for project screening.

Recommended uses
Performance benefits
Technical data
“Requirement” is the stated acceptance threshold or range. “Actual result”, “typical value” and “published value” are not guaranteed minima unless the requirement column says so. Final acceptance must follow the approved TDS, report, test method and project conditions.
| Property | Minimum / specified requirement | Typical / reported value | Test method / source |
|---|---|---|---|
| Flowability - initial / 30 / 60 min | ≥290 / ≥260 / ≥230 mm | — | GB/T 50448-2015; supplied offshore-wind manual |
| Enhanced published flow route - initial / 30 / 60 min | — | Published product value≥340 / ≥310 / ≥260 mm | Product column in the supplied offshore-wind manual; confirm current controlled TDS |
| Initial setting time | ≥120 min | — | GB/T 50080; supplied offshore-wind manual |
| Fresh apparent density | 2,350-2,500 kg/m³ | — | Supplied offshore-wind manual |
| Air content | ≤4% | — | GB/T 50080; supplied offshore-wind manual |
| Bleeding | 0% | — | GB/T 50080; supplied offshore-wind manual |
| Compressive strength - 1 / 3 / 28 days | ≥50 / ≥85 / ≥125 MPa | — | GB/T 50081; supplied offshore-wind manual |
| Static compressive elastic modulus - 1 / 28 days | ≥12 / ≥45 GPa | — | GB/T 50081; supplied offshore-wind manual |
| 24-hour minus 3-hour vertical expansion | 0.02-0.50% | — | GB/T 50448-2015; supplied offshore-wind manual |
| Packaging verification | — | Source conflictWebsite image: 25 kg; supplied English translation: 50 kg | Confirm the current batch label and controlled TDS before ordering |
Project approval input
A technical recommendation is only as reliable as the project information supplied with the enquiry.
Foundation, annulus, segment joint, duct or blade bond-line drawing.
Gap, section, lift height, net material volume and contingency.
Strength ages, flow, modulus, bond, fatigue, durability and test methods.
Material, water, substrate and ambient temperature plus exposure conditions.
Mixer output, pump, hose diameter, distance, access and standby capacity.
Batch cycle, working time, continuous-placement plan, curing and release point.
English technical data sheet
Prepared from the supplied Sino-sina Building Materials Co., Ltd. product manual. Requirements are kept separate from published or reported values. Use the current controlled document and project specification for final approval.
Related materials
Offshore wind turbine grout
Offshore wind turbine grout
Offshore wind turbine grout
Technical enquiry
Include the wind structure and connection drawing, geometry or bond line, volume, specified performance, temperature, standards, installation window and equipment.