Wind energy materials · onshore · offshore · hybrid towers
info@sino-sina.comWhatsApp +86 153 7387 2353

Australia · English

Wind turbine foundation grout for Australian projects

Technical screening for onshore and offshore wind structures, with grade selection based on specified strength, working time, exposure, installation temperature and local acceptance requirements.

LOCAL APPLICATION REVIEW

Australian project considerations

  • Project specification and applicable Australian or international test method
  • Hot-weather workability and material conditioning where required
  • Mixer and pump capacity for large foundation volumes
  • Exposure, fatigue and durability requirements

PROJECT INPUT

Data required for screening

  1. 01Foundation or connection type
  2. 02Grout gap and total volume
  3. 03Required strength ages and test methods
  4. 04Temperature range, equipment and pump distance

DOCUMENTED APPLICATION CASES

Field methods for demanding wind projects

Cases connect the joint condition, material route and quality-control sequence without inferring client identities.

SCREENING RANGE

CBGM-80 / 100 / 120 · CBGM-125 / 130 Offshore · CBGM Antifreeze

Final selection is subject to the project specification, approved technical data, trial procedure and installation method.

01

Wind turbine foundation grout

CBGM-80 Wind Turbine Foundation Grout

Screening intentOnshore wind turbine baseplates
Product evidence
02

Offshore wind turbine grout

CBGM-125 Offshore Wind Turbine Grout

Screening intentMonopile and transition-piece grouted connections
Product evidence
03

Cold-weather wind turbine grout

CBGM Antifreeze Wind Turbine Foundation Grout

Screening intentWinter installation of onshore wind turbines
Product evidence

Australia

Send the project data for a technical shortlist

info@sino-sina.com · WhatsApp +86 153 7387 2353