Wind energy materials · onshore · offshore · hybrid towers
info@sino-sina.comWhatsApp +86 153 7387 2353

Cold-weather wind turbine grout

CBGM Antifreeze Wind Turbine Foundation Grout

A low-temperature, high-strength, non-shrink grout for winter wind farm construction and cold-region baseplate or anchor-cage placement. The published manual specifies flow at sub-zero conditioning and strength development under a defined negative-temperature curing route.

Selection focus: cold weather wind turbine grout
Sino-sina CBGM Antifreeze cold-weather wind turbine grout 25 kilogram bag
Unified English packaging - CBGM Antifreeze cold-weather wind turbine grout

Recommended uses

Where this material fits.

  • Winter installation of onshore wind turbines
  • Cold-region baseplates and anchor cages
  • High-altitude and severe-climate wind farms
  • Temperature-controlled emergency grouting

Performance benefits

What the system is designed to deliver.

  • Manual positions the system for work down to -20°C
  • Flow requirements stated at -5°C and 8°C
  • Zero bleeding requirement
  • Low-temperature strength route stated separately from standard curing

Technical data

Requirements and reported values, separated.

“Requirement” is the stated acceptance threshold or range. “Actual result”, “typical value” and “published value” are not guaranteed minima unless the requirement column says so. Final acceptance must follow the approved TDS, report, test method and project conditions.

PropertyMinimum / specified requirementTypical / reported valueTest method / source
Flowability at -5°C - initial / 30 min≥300 / ≥260 mmSupplied Chinese product manual; verify in the approved cold-weather method statement
Flowability at 8°C - initial / 30 min≥300 / ≥260 mmSupplied Chinese product manual
Negative-temperature compressive strength - 12 h / 1 d / 3 d≥25 / ≥35 / ≥60 MPaSupplied Chinese product manual; follow the stated conditioning route
Negative-temperature compressive strength - 7 d plus 21 d≥85 MPaSupplied Chinese product manual
3-hour vertical expansion0.02-2.0%Supplied Chinese product manual
24-hour minus 3-hour expansion0.02-0.40%Supplied Chinese product manual
28-day dry shrinkage≤0.045%Supplied Chinese product manual
Chloride ion content≤0.03%Supplied Chinese product manual
Bleeding0%Supplied Chinese product manual

Project approval input

Send the data that can change the product decision.

A technical recommendation is only as reliable as the project information supplied with the enquiry.

  1. 01Structure & connection

    Foundation, annulus, segment joint, duct or blade bond-line drawing.

  2. 02Geometry & volume

    Gap, section, lift height, net material volume and contingency.

  3. 03Acceptance criteria

    Strength ages, flow, modulus, bond, fatigue, durability and test methods.

  4. 04Environment

    Material, water, substrate and ambient temperature plus exposure conditions.

  5. 05Installation equipment

    Mixer output, pump, hose diameter, distance, access and standby capacity.

  6. 06Construction window

    Batch cycle, working time, continuous-placement plan, curing and release point.

English technical data sheet

CBGM Antifreeze Wind Turbine Grout - English TDS

Prepared from the supplied Sino-sina Building Materials Co., Ltd. product manual. Requirements are kept separate from published or reported values. Use the current controlled document and project specification for final approval.

Download English TDS

Photographed field method

Wind foundation grout installation, shown in the correct sequence.

These upright site photographs document controlled mixing, secondary grouting around the anchor system and the completed load-transfer zone. They support the method statement; they do not replace the approved product TDS or project inspection plan.

Open the installation guide
Wind turbine foundation grout being mixed beside the anchor-bolt ring at high altitude
Controlled mixing and material staging beside the anchor-bolt ring.
Crew placing secondary grout around a wind turbine foundation anchor-bolt assembly
Secondary grout placement around the foundation connection.
Completed circular wind turbine anchor-cage grout zone before tower installation
Completed foundation load-transfer zone before tower installation.

Technical enquiry

Check whether CBGM Antifreeze Wind Grout matches your project.

Include the wind structure and connection drawing, geometry or bond line, volume, specified performance, temperature, standards, installation window and equipment.