Wind energy materials · onshore · offshore · hybrid towers
info@sino-sina.comWhatsApp +86 153 7387 2353

Wind turbine foundation grout

CBGM-140 Wind Turbine Foundation Grout

A high-strength 140 MPa-class cementitious grout for heavily loaded wind turbine foundation joints where the approved specification requires very high compressive strength, high modulus, retained flow and controlled expansion.

Selection focus: 140 MPa wind turbine grout
Sino-sina CBGM-140 wind turbine foundation grout 25 kilogram bag
Unified English packaging - CBGM-140

Recommended uses

Where this material fits.

  • High-capacity wind turbine baseplates
  • Heavily loaded anchor cages
  • Large structural load-transfer zones
  • High-strength foundation retrofits subject to design approval

Performance benefits

What the system is designed to deliver.

  • 150.3 MPa reported 28-day compressive strength
  • 302 mm reported initial flow
  • 49 GPa reported modulus
  • Zero bleeding in the reviewed report

Technical data

Requirements and reported values, separated.

“Requirement” is the stated acceptance threshold or range. “Actual result”, “typical value” and “published value” are not guaranteed minima unless the requirement column says so. Final acceptance must follow the approved TDS, report, test method and project conditions.

PropertyMinimum / specified requirementTypical / reported valueTest method / source
Compressive strength - 1 day≥45 MPaActual result50.3 MPaIndependent commissioned test
Compressive strength - 3 days≥80 MPaActual result89.4 MPaIndependent commissioned test
Compressive strength - 28 days≥140 MPaActual result150.3 MPaIndependent commissioned test
Initial flowability≥290 mmActual result302 mmIndependent commissioned test
30-minute flowability≥260 mmActual result271 mmIndependent commissioned test
3-hour vertical expansion≥0.02%Actual result0.05%Independent commissioned test
24-hour minus 3-hour expansion≥0.02%Actual result0.04%Independent commissioned test
Static compressive elastic modulus≥45 GPaActual result49 GPaIndependent commissioned test
Chloride ion content≤0.06%Actual result0.04%Independent commissioned test
Bleeding0%Actual result0%Independent commissioned test

Project approval input

Send the data that can change the product decision.

A technical recommendation is only as reliable as the project information supplied with the enquiry.

  1. 01Structure & connection

    Foundation, annulus, segment joint, duct or blade bond-line drawing.

  2. 02Geometry & volume

    Gap, section, lift height, net material volume and contingency.

  3. 03Acceptance criteria

    Strength ages, flow, modulus, bond, fatigue, durability and test methods.

  4. 04Environment

    Material, water, substrate and ambient temperature plus exposure conditions.

  5. 05Installation equipment

    Mixer output, pump, hose diameter, distance, access and standby capacity.

  6. 06Construction window

    Batch cycle, working time, continuous-placement plan, curing and release point.

English technical data sheet

CBGM Wind Turbine Foundation Grout - English TDS

Prepared from the supplied Sino-sina Building Materials Co., Ltd. product manual. Requirements are kept separate from published or reported values. Use the current controlled document and project specification for final approval.

Download English TDS

Independent test evidence

Privacy-protected evidence, not a marketing claim.

Values in the reported-result column were transcribed from independent laboratory reports supplied by Sino-sina. Public material retains Sino-sina Building Materials Co., Ltd. and, where positively verified, the testing institution and report reference; project/client identities, personnel, signatures, stamps, QR codes and contact addresses are omitted.

Download English test summary

Photographed field method

Wind foundation grout installation, shown in the correct sequence.

These upright site photographs document controlled mixing, secondary grouting around the anchor system and the completed load-transfer zone. They support the method statement; they do not replace the approved product TDS or project inspection plan.

Open the installation guide
Wind turbine foundation grout being mixed beside the anchor-bolt ring at high altitude
Controlled mixing and material staging beside the anchor-bolt ring.
Crew placing secondary grout around a wind turbine foundation anchor-bolt assembly
Secondary grout placement around the foundation connection.
Completed circular wind turbine anchor-cage grout zone before tower installation
Completed foundation load-transfer zone before tower installation.

Related materials

Compare products in the same engineering family.

Wind turbine foundation grout

CBGM Onshore Wind Grout

A factory-blended range of flowable, pumpable and shrinkage-compensated cementitious grouts for onshore wind turbine baseplates, anchor cages and structural load-transfer zones. Grades are selected against the specified strength class, installation temperature, gap geometry and construction window.
Primary search intent
wind turbine foundation grout
Best fit
Wind turbine baseplate undergrouting
View product & technical data

Wind turbine foundation grout

CBGM-80 Wind Grout

A high-flow, non-shrink cementitious grout for onshore wind turbine baseplates and anchor cages where the approved design calls for an 80 MPa-class 28-day compressive strength requirement.
Primary search intent
80 MPa wind turbine foundation grout
Best fit
Onshore wind turbine baseplates
View product & technical data

Wind turbine foundation grout

CBGM-100 Wind Grout

A 100 MPa-class, high-flow cementitious foundation grout for onshore wind turbines, designed for efficient baseplate placement, controlled expansion and resistance to cyclic environmental exposure.
Primary search intent
100 MPa wind turbine grout
Best fit
Wind turbine tower flange grouting
View product & technical data

Technical enquiry

Check whether CBGM-140 Wind Grout matches your project.

Include the wind structure and connection drawing, geometry or bond line, volume, specified performance, temperature, standards, installation window and equipment.